Freyssinet Limited

Stand D37
Structural specialists for new build, refurbishment and asset life extension For over 75 years, Freyssinet UK has delivered specialist engineering solutions to construct, maintain and extend the life of critical infrastructure across the UK and Ireland. A complete approach to Asset Care Our Asset Care Framework, supported by our 6D asset lifecycle approach, brings together expertise across every stage of an asset’s life, from inspection and diagnosis through to repair, strengthening, protection and long-term performance management. By understanding the condition of an asset and selecting the right intervention at the right time, we help clients move from reactive maintenance to proactive asset management, improving safety, resilience, performance and whole-life value. Specialist solutions Our capabilities include specialist inspections and surveys, post-tensioning inspections, concrete repair, bridge bearings, expansion joints, hydrodemolition, jacking and propping, heavy lifting, structural strengthening and Freyssicare protection systems. Inspect. Diagnose. Repair. Strengthen. Protect. Extend.

Videos

M27 Junction 10 Improvement - Autoripage® - December 2025
The M27 Junction 10 Improvement Scheme is one of Hampshire’s most ambitious highway infrastructure upgrades, commissioned by Hampshire County Council in partnership with National Highways. To support the long-term expansion and improve regional mobility, the scheme transforms the existing interchange into a fully operational “all‑moves” junction, significantly upgrading access between the M27 and the surrounding strategic road network. Freyssinet provided a full turnkey service for the Autoripage® operation, including engineering, supply, installation, operation, and technical leadership throughout the sliding procedure. • Design of temporary guiding raft and pushing slab • Technical support for the Autoripage® • Design and supply of all necessary components for Autoripage ® including the anchorage blocks, passive/active deviators, steel inserts, strands, Ipalen plate, grease, bentonite etc. • Installation of the strands for jacking operation. • Design, supply, installation & commissioning of the hydraulic jacking system. • Operate the box push operation. Freyssinet’s contribution was instrumental in enabling the project to maintain both its engineering objectives and its strict motorway closure programme - delivering a critical structure with exceptional accuracy, efficiency, and operational safety.
A46 Kenilworth Box Slide - Autoripage® - April 2025
n April 2025, the Freyssinet team successfully installed a 14,750-tonne box structure that will carry the HS2 line beneath the A46 Kenilworth Bypass in Warwickshire. Utilising Freyssinet's Autoripage® technology, the structure - comprising approximately 4,300 cubic metres of concrete and 120 precast beams - was moved 64 metres into position under the existing carriageway. This was accomplished using a guided sliding system powered by hydraulic jacks, supported by 60 kilometres of strand cables and a purpose-built pushing slab. One of the biggest challenges was the 1% gradient, which required precise control of the box’s vertical alignment throughout the movement. Continuous monitoring and adjustments ensured the structure remained within strict tolerances. Despite its complexity, the entire box slide was completed in just 9.5 hours - 6.5 hours ahead of schedule.
Asticus - jacking a 10-storey building in London
The Asticus building is a striking 10-storey reinforced concrete circular office complex in Westminster, London, adjacent to the St. James underground station. Freyssinet was engaged to carry out the associated temporary works design and jacking of the building to enable the installation of an additional floor between the existing eighth and ninth floors. The planned extension works were to maintain the integrity of the original architectural features while providing an extra floor and additional office space. The solution was proposed by Freyssinet as an alternative to the demolition of the roof and the building of new floors from the bottom up which has significantly reduced the environmental impact of the project.