Repair, Refurbish, Renovate

Sessions at Bridges Scotland

Wednesday 27 November 2024

10:50

Exploring Design Options for the M6 Lune Gorge

10:50 - 11:15 Repair, Refurbish, Renovate
  • Overview of the M6 Lune Gorge scheme.
  • Lessons learned so far from the design phase.
  • Complexity of delivery (live M6 project).
  • First National Highways resilience scheme of this type.
  • This is the future, major maintenance of our aging assets.

Mentimeter Q&A Link

14:00

The Aftermath of Storm Babet

14:00 - 14:25 Repair, Refurbish, Renovate
  • Storm Babet brought exceptional rainfall to parts of eastern Scotland with 150-200mm falling in the wettest areas and the Met Office issuing two red warnings for rain. 
  • This presentation will look at the significant damage endured on the Lower North Water Bridge and the North Water Viaduct crossing the River North Esk, and the challenges involved to design and deliver emergency repair solutions.

Mentimeter Q&A Link 

14:25

Tay Road Bridge Refurbishment

14:25 - 14:50 Repair, Refurbish, Renovate
  • Why the need to refurbish?
  • Alternative transport options considered.
  • Traffic management solution adopted.
  • Phase 1 lessons learned.
  • Phase 2 and bridge completion.

Mentimeter Q&A Link

Thursday 28 November 2024

14:25

Kincardine Bridge Southern Piled Viaduct Replacement Project

14:25 - 14:50 Repair, Refurbish, Renovate
  • Brief history of Kincardine Bridge.
  • Background to southern piled viaduct replacement.
  • Overview of construction and challenges.

Mentimeter Q&A Link